CURRENT CONTRACTS
- Belmont Reservoir Spillway Modifications.
- A34 Alderley Edge Bypass, Welsh Row Bridge.
- A34 Alderley Edge Bypass, Brook Lane Bridge.
- A34 Alderley Edge Bypass, Chelford Road Bridge.
Return to top.
Return to top.
Return to top.
Return to top.
PREVIOUS CONTRACTS
- North Manchester Business Park, Metro Link Station.
- Crossehall Farm Bridge, Chorley.
- Broadway Link Road Bridge, Manchester.
- Croston WWTW, Radius Tank.
- Marine Parade, Southport.
- Whitehills Business Park, Blackpool, Slabs.
- Townside Development, Bury, Waling Beams etc.
- Heaton Lodge, Lift shaft, Prestwich.
- Standish Lodge, Retaining Walls, Standish.
- Saville Bridge, Bridge Strengthening, Dewsbury.
- Skateboard Park, Runcorn.
- Preston Waste Transfer Centre.
- M62, Junction 21, Bridge Strengthening.
- Frenches Marina, Greenfield, Oldham.
- Cloughs Foot, Mine Water Treatment Tanks, Todmorden.
- River and Rail Bridge, Matlock.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
GENERAL CONTRACTS
- Aero Deck to Soffits.
- Basement Walls.
- Lift Pit Base.
- Retaining Wall Base.
- Retaining Wall Base No 2.
- Track Side Retaining Walls, Lichfield No1.
- Track Side Retaining Walls, Lichfield No2.
- Retaining Walls, Manor Farm.
- Slab, Wellington Mill, Bury.
- Stantion Base.
- Suspended Slab Construction.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.
Return to top.